欧博电脑版下载:KPower gets four-year PPA extension
时间:3个月前 阅读:11 评论:1
In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.皇冠博彩网址(www.hg9988.vip)是皇冠体育官方博彩平台,开放皇冠信博彩网代理申请、博彩网会员开户的线上博彩的官方平台。
PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.
In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.
,,欧博电脑版下载(www.aLLbet8.vip)是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。
KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.
转载说明:本文转载自Sunbet。
网友评论
扯着俩个蛋四处跑骚≠
回复高大上的感觉